TM44 air conditioning inspections, arranged and followed through by the engineers who maintain the plant
A TM44 inspection is the air conditioning inspection that England and Wales law requires at least every five years for systems with an effective rated output over 12kW. An accredited energy assessor carries it out and lodges the report on the national register. Rossair arranges your TM44 inspection with an accredited air conditioning energy assessor, then carries out the repair and efficiency work the report recommends.
One point of contact for the inspection and the work that follows
TM44 is CIBSE Technical Memorandum 44, the method used to inspect air conditioning systems. The inspection must be done by an accredited energy assessor, and we do not carry out the assessment ourselves. We arrange it with an accredited air conditioning energy assessor, give the assessor the plant details, maintenance records and access they need, and make sure the report is lodged and in your compliance pack. The inspection looks at efficiency, controls, maintenance and sizing, and then makes recommendations. There is no legal requirement to act on them, but they are usually where the savings are, and we carry out the work: servicing, controls adjustment and plant replacement.
- TM44 inspections arranged with an accredited air conditioning energy assessor
- Records and plant details gathered beforehand, which can reduce the scope of the inspection
- Report lodged on the register and filed in your compliance pack, with the next inspection date tracked
- Recommendations costed and carried out by the same engineers who maintain the plant
- Multiple split and VRF units counted together where they are under one person’s control
- Inspections for single buildings and multi-site estates, planned around occupancy
- Air conditioning maintenance, so the next inspection finds a well-kept system

What TM44 means for your building
The duty sits with whoever controls the technical operation of the system, which is usually the owner. These are the points that decide whether you need an inspection.
Does your system need a TM44 inspection?
The rules apply to air conditioning systems with an effective rated output of more than 12kW. Where you control the temperature of several separate units in a building, they count as one system, so a set of small split units can add up to more than 12kW. Check the combined output on the manufacturer’s data plates before assuming you are below the threshold.
What the inspection looks at
The assessor inspects the accessible parts of the system: the refrigeration equipment and heat exchangers, air-moving plant such as filters and fans, and the controls, including setpoints, operating hours and zones. They review maintenance records, and the report assesses efficiency and sizing compared with the building’s cooling needs, with advice on cost-effective improvements.
What happens after the report
You keep the most recent report and pass it to whoever takes over the system. The recommendations cover maintenance, controls and oversized or ageing plant. We cost them, agree priorities with you and carry them out, with the same servicing visits kept on your PPM.
Air conditioning maintenanceIn schools and colleges
A school or college with classroom cooling, IT rooms and staff areas can pass 12kW easily, and the inspection has to be planned around term dates. We coordinate the assessor’s access and keep the report with the rest of the estate’s compliance records.
Air conditioning for schoolsCompliance that sits inside your maintenance programme
A TM44 inspection works best when the plant is already well documented. Rossair keeps service records for every unit under PPM, so the assessor has the information on day one, and the report’s recommendations go straight into the next maintenance visit. Chichester College Group has run on that model across 11 campuses for over 20 years, under one PPM contract.
The rules behind TM44
- EPB Regulations 2012Energy Performance of Buildings (England and Wales) Regulations 2012, Part 4: air conditioning systems over 12kW must be inspected by an energy assessor at intervals not exceeding five years.
- Accredited assessorThe assessor must belong to an approved accreditation scheme, and the report is only valid when lodged on the register.
- RecordsThe person in control keeps the latest report, hands it on when control changes, and must produce it within seven days if an enforcement officer asks.
- PenaltyA penalty charge of £300 applies to a breach of the inspection duty. Local weights and measures authorities, usually Trading Standards, enforce.
- CIBSE TM44Inspection of air conditioning systems. The technical method the assessor follows.
- REFCOM F-GasREFCOM F-Gas registered, for refrigerant work on air conditioning plant.
Sectors we serve
Related services
Questions about TM44 air conditioning inspections
What is a TM44 inspection?
Who needs a TM44 inspection?
How often is a TM44 inspection required?
Can Rossair carry out the TM44 inspection?
What happens if I do not have a TM44 report?
Do I have to act on the TM44 recommendations?
How much does a TM44 inspection cost?
If we’re not the right fit, we’ll tell you who is
Arrange a TM44 inspection
Your enquiry goes to our technical team. We call back within one working day.