Planned Maintenance: The Key to Optimising Your HVAC Assets

In the bustling world of UK’s commercial and industrial sectors, ensuring HVAC systems operate at peak performance is not just a luxury - it’s a necessity.

Understanding Planned Maintenance

Planned maintenance, often referred to as preventive or scheduled maintenance, involves regular, pre-arranged checks and servicing of equipment to ensure they function optimally and to prevent potential breakdowns.

Why is Planned Maintenance Imperative for HVAC Assets?

  1. Extended Equipment Life: Regular checks and timely interventions ensure that minor issues are caught before they escalate into major problems.
  2. Enhanced Energy Efficiency: A well-maintained HVAC system runs more efficiently.
  3. Reduced Downtime: Planned maintenance drastically reduces the risk of unforeseen breakdowns, ensuring seamless operations.
  4. Safety Assurance: Faulty HVAC systems can be a health hazard, potentially releasing harmful gases or causing fires.
  5. Cost-Effective: While planned maintenance involves an upfront cost, it is often more cost-effective in the long run.

Mechanical and Electrical Service: An Integrated Approach

Trust in our dedicated mechanical and electrical service to protect, optimise, and extend the life of your HVAC assets.

In Conclusion

Planned maintenance is more than a tick-box exercise - it’s a strategic investment in the longevity, safety and efficiency of every building service asset you own. Done properly, it costs less than reactive failure, drives energy savings that often outweigh the contract fee, and produces the documented evidence trail your auditors, insurers and regulators expect to see.

Quick facts

Planned maintenance at Rossair - the facts

The standards, cycles and records produced by an SFG20-scheduled Rossair PPM contract.

Service
Planned Preventative Maintenance (PPM) for HVAC and building services
Standard
SFG20 task grades (Statutory / Mandatory / Optional)
Statutory frameworks covered
LRA, F-Gas, EICR, Gas Safe, Fire Safety Order
Reactive cover
Bundled - 24/7, 4-hour emergency response
Typical cycles
AC biannual, ventilation quarterly, boilers annual, BMS annual review
Energy savings from PPM
Typically 15-30% recovered on neglected systems
Records
Asset register, visit reports, F-Gas leak records, EICR, compliance pack
Multi-site
One account manager, consolidated SFG20 across sites
Named long-term
Chichester College Group (11 campuses, 20+ years)
In trade since
1973 (52+ years)
Coverage
UK-wide
Telephone
01420 566822
Frequently asked

Planned maintenance - common questions

What is the difference between planned maintenance and reactive maintenance?
Planned maintenance is scheduled, pre-arranged servicing carried out on a defined frequency (e.g., quarterly, biannual, annual). Reactive maintenance is the response when equipment has already failed. The cost ratio is roughly 1:3-5 - planned maintenance is dramatically cheaper than reactive, and orders of magnitude cheaper than the business interruption a major failure causes. Rossair PPM contracts bundle both: planned schedule + 24/7 reactive cover.
What standard governs UK planned maintenance schedules?
SFG20, published by BESA (Building Engineering Services Association), is the de-facto UK standard for planned maintenance. It defines task lists, frequencies and grades (Statutory / Mandatory / Optional) for every building services asset. Working to SFG20 gives buyers an objective definition of what they’re paying for and gives engineers a clear schedule against every visit. Rossair contracts are SFG20-scheduled as standard.
How often should commercial HVAC equipment be planned-maintained?
Frequency varies by equipment and SFG20 task grade. Common HVAC PPM cycles: air conditioning - biannual service; ventilation - quarterly filter changes plus annual LEV TExT for industrial systems; boilers and chillers - annual major service plus quarterly checks; controls/BMS - annual review. High-use sites (24/7 operations, hospitals, data centres) typically scale frequencies up.
How does planned maintenance improve HVAC energy efficiency?
Dirty coils, clogged filters, low refrigerant charge and out-of-calibration controls collectively waste 15-30% of an HVAC system’s electricity. Planned maintenance addresses each: filter change restores airflow, coil clean restores heat transfer, F-Gas top-up restores cooling capacity, control recalibration matches output to demand. The energy savings typically outweigh the PPM contract cost on systems above 20-50 kW.
What records does planned maintenance produce?
A Rossair PPM contract produces: SFG20-scheduled visit records signed by the engineer, asset register with condition grades, F-Gas leak detection records (5-year retention), Legionella Risk Assessment (LRA) records, electrical EICR certificates, and a consolidated compliance pack delivered to the named account manager. The pack supports audits, building sales and Ofsted/CQC inspections.
Can planned maintenance be tailored to a specific budget?
Yes. SFG20 itself supports this with task grades - Statutory tasks (must do, legally required), Mandatory tasks (industry-standard, breach voids warranty), Optional tasks (best practice). Rossair scopes PPM contracts at the right grade for the building’s risk profile and budget, with clear visibility on what’s in and what’s out. The named technical lead reviews the schedule annually as assets and risk change.

If we’re not the right fit, we’ll tell you who is

Request a planned maintenance proposal

Tell us about your estate - asset list, current arrangements, sites. Your enquiry goes to our maintenance lead. We call back within one working day.

We’ll only use your details to respond to your enquiry. See our privacy notice.

Call 01420 566822