PSDS delivered

Building services for NHS healthcare estates

Rossair delivers HVAC decarbonisation, planned maintenance, and HTM 03-01 compliance for NHS trusts. Named proof: Wembley Health Centre - full gas removal, zero clinical sessions lost.

Delivering in NHS Healthcare estatesNamed proof. Sector-specific compliance. One call to our technical team.
PSDS
Funded project delivered (Wembley)
0
Clinical sessions lost - Wembley project
Stage 4
In-house mechanical design
24/7
Emergency cover for clinical estates
Services for this sector

What Rossair delivers for nhs healthcare estates

Decarbonisation & Retrofit

delivered with zero clinical disruption.

  • PSDS-eligible project delivery
  • Gas removal in live clinical environments
  • ASHP and heat pump installation
  • HTM 03-01 compliant documentation
Learn more about Decarbonisation & Retrofit

Planned Maintenance

SFG20-scheduled PPM with HTM 03-01 compliance documentation for NHS clinical estates.

  • SFG20-compliant maintenance schedules
  • HTM 03-01 ventilation documentation
  • Legionella Risk Assessment (LRA)
  • 24/7 reactive cover included
Learn more about Planned Maintenance

MEP Installations

Stage 4 mechanical design in-house for NHS clinical environments.

  • Clinical environment experience
  • Stage 4 mechanical design in-house
  • Gas Safe and NICEIC accredited
  • Infection control compliance
Learn more about MEP Installations

Design & Consultancy

RIBA Stages 2-5 design for NHS buildings without consultant handoff.

  • HTM 03-01 ventilation design
  • BIM Level 2 deliverables
  • RIBA Stages 2-5 without handoff
  • In-house design through sign-off
Learn more about Design & Consultancy
Delivered proof

Wembley Health Centre - PSDS project

Wembley Health Centre - PSDS-funded gas removal in a live NHS clinical environment, delivered with zero clinical sessions lost. Stage 4 mechanical design produced and installed by the same Rossair team. HTM 03-01 compliant commissioning documentation issued at handover. Full case study available on request.

Insulated heating pipework and pressure gauges at Wembley Health Centre
Frequently asked

Questions from NHS estates leads

Can Rossair deliver HVAC decarbonisation in a live NHS clinical environment?
Yes. The Wembley Health Centre project is proof. Full gas removal in a live clinical environment with zero clinical sessions lost. We plan around infection control requirements and clinical schedules.
How does Rossair handle HTM 03-01 compliance documentation?
Rossair produces full HTM 03-01 ventilation commissioning documentation as standard on all NHS projects. Documentation is provided within 24 hours of commissioning sign-off.
What is Rossair's emergency HVAC response time for NHS buildings?
Rossair provides 24/7 emergency cover with a 4-hour response target for contracted NHS clients. Response time is specified in each PPM contract.

If we’re not the right fit, we’ll tell you who is

Ready to talk about your nhs healthcare estate?

We call back within one working day. Your enquiry goes to our technical team - not a call centre.

We’ll only use your details to respond to your enquiry. See our privacy notice.

Call 01420 566822