
Renewable energy installations for commercial and public sector buildings
Rossair installs commercial solar PV systems and battery energy storage (BESS) for commercial, education and public sector buildings. MCS certified. DNO approval and G98/G99 grid protection handled in-house. From roof survey to commissioning, under one contractor.
Commercial solar PV and battery storage - MCS certified, DNO approved
Rossair designs, installs and commissions commercial solar PV systems and battery energy storage (BESS) for buildings looking to cut energy costs and on-site carbon. All work is MCS certified and includes DNO application, G98/G99 protection and grid connection approval. See dedicated pages for commercial solar PV systems, BESS projects, and commercial PV installations.
- Commercial solar PV design and installation
- Battery energy storage systems (BESS)
- MCS certification on every installation
- DNO approval and G98/G99 compliance
- Roof survey and structural assessment included

Commercial PV and BESS - delivered under one accountable contractor
Rossair runs solar PV and battery storage as a single delivery line - structural roof assessment, electrical design, MCS-certified install, DNO application, and grid commissioning. Existing commercial PV installations are documented in our case studies. Reference projects available on request.
Compliance documentation included in every contract
- MCSMicrogeneration Certification Scheme - required for all solar PV and heat pump installations.
- DNODistribution Network Operator approval for grid connection.
- G98/G99Grid protection relay standards for solar PV installations over 3.68kW.
- BCABattery Certification Authority standards for BESS installations.
- IET WiringIET Wiring Regulations (BS 7671) for all electrical installation work.
- NICEICNICEIC registration for electrical installation certification.
Sectors we serve
Renewable energy pages by topic
Questions about our renewable energy service
What size commercial solar PV system can Rossair install?
Does Rossair handle the DNO application for grid connection?
What is a battery energy storage system (BESS) and does Rossair install them?
Is MCS certification required for commercial solar PV installations?
If we’re not the right fit, we’ll tell you who is
Talk to our renewable energy team
Your enquiry goes to our technical team. We call back within one working day.
