Renewable energy installations for commercial and public sector buildings

Rossair installs commercial solar PV systems and battery energy storage (BESS) for commercial, education and public sector buildings. MCS certified. DNO approval and G98/G99 grid protection handled in-house. From roof survey to commissioning, under one contractor.

What we deliver

Commercial solar PV and battery storage - MCS certified, DNO approved

Rossair designs, installs and commissions commercial solar PV systems and battery energy storage (BESS) for buildings looking to cut energy costs and on-site carbon. All work is MCS certified and includes DNO application, G98/G99 protection and grid connection approval. See dedicated pages for commercial solar PV systems, BESS projects, and commercial PV installations.

  • Commercial solar PV design and installation
  • Battery energy storage systems (BESS)
  • MCS certification on every installation
  • DNO approval and G98/G99 compliance
  • Roof survey and structural assessment included
Commercial solar PV installation

Commercial PV and BESS - delivered under one accountable contractor

MCS
Certified installer
DNO
Approval handled in-house
BESS
Battery storage capability
G98
G99 grid connection compliance

Rossair runs solar PV and battery storage as a single delivery line - structural roof assessment, electrical design, MCS-certified install, DNO application, and grid commissioning. Existing commercial PV installations are documented in our case studies. Reference projects available on request.

Compliance

Compliance documentation included in every contract

  • MCSMicrogeneration Certification Scheme - required for all solar PV and heat pump installations.
  • DNODistribution Network Operator approval for grid connection.
  • G98/G99Grid protection relay standards for solar PV installations over 3.68kW.
  • BCABattery Certification Authority standards for BESS installations.
  • IET WiringIET Wiring Regulations (BS 7671) for all electrical installation work.
  • NICEICNICEIC registration for electrical installation certification.
Frequently asked

Questions about our renewable energy service

What size commercial solar PV system can Rossair install?
Rossair installs commercial solar PV systems for flat-roof and pitched-roof commercial buildings, from sub-50kW installations through to large rooftop arrays in the multi-hundred kW range. System size is driven by available roof area, structural capacity, and the building load profile. Roof surveys and indicative sizing are part of the initial proposal.
Does Rossair handle the DNO application for grid connection?
Yes. Rossair handles DNO applications and G98/G99 grid protection compliance in-house as part of every commercial PV installation. From survey to commissioned, grid-tied system, the process sits under one contractor and one programme.
What is a battery energy storage system (BESS) and does Rossair install them?
A BESS stores electricity (either from on-site PV or off-peak grid import) for later use, reducing peak demand charges and enabling resilience. Rossair installs BESS alongside solar PV and as standalone retrofits. See the BESS projects page for installation detail.
Is MCS certification required for commercial solar PV installations?
For systems up to 50kW, MCS certification is required to qualify for the Smart Export Guarantee (SEG) and to meet most building warranty requirements. For larger commercial systems, MCS demonstrates installer quality regardless of SEG eligibility. All Rossair solar PV installations are MCS certified.

If we’re not the right fit, we’ll tell you who is

Talk to our renewable energy team

Your enquiry goes to our technical team. We call back within one working day.

We’ll only use your details to respond to your enquiry. See our privacy notice.

Call 01420 566822