Heat decarbonisation plans for schools, written by the engineers who install the heat pumps
A heat decarbonisation plan is a costed, phased route for taking a school or college off fossil fuel heating, and we write them. Each plan surveys your existing plant, tests heat pump and hybrid options against your electrical capacity, and sets out what to replace first, what it costs and where funding could fit. The Public Sector Decarbonisation Scheme (PSDS) is no longer taking new investment, so a plan now mostly supports a Condition Improvement Fund bid or your own capital programme. We installed a 140kW heat pump from stock in 48 hours on the Chichester College estate.
A plan you can act on, from the contractor that delivers the works
Many plans stall because the author never has to build what they recommend. Ours do not: the engineers who survey the plant also price, install and commission heat pumps, so the plan reflects what can actually be delivered on a live school site. It covers the existing heating and its condition, the building fabric, the electrical supply, the options for replacing gas, and a phased order of works that fits term dates and holidays.
- Survey of existing boilers, pumps, controls and heat emitters, with their condition
- Options appraisal: air source heat pumps, ground source, hybrid, or keeping gas for now
- Electrical capacity check, because heat pumps change the load on the site
- Fabric and energy-saving measures that reduce the heating the school needs
- Phased roadmap with costs, running cost comparison and carbon savings
- Funding fit: which route suits each phase, including Condition Improvement Fund bids

Where PSDS stands, and what to do instead
These points come from Salix Finance, which delivers the scheme, and the DfE’s Condition Improvement Fund guidance for 2027-28. Funding rules change, so check the sources before you commit.
PSDS: no new investment
In June 2025 the government said it would commit no further investment to the Public Sector Decarbonisation Scheme beyond projects already awarded. Awarded projects remain fully funded. Phase 4 grant funding runs until 31 March 2028. If your school does not already hold an award, PSDS is not a live route.
Low Carbon Skills Fund
The Public Sector Low Carbon Skills Fund paid for heat decarbonisation plans and detailed designs. Salix shows Phase 4 as closed, and we found no open round at the time of writing. Schools that want a plan now generally fund it from their own budget, and we can scope it to fit.
Condition Improvement Fund
For academies, sixth-form colleges and small trusts, CIF is the main capital route for replacing failing heating. DfE gives priority to replacing coal and oil boilers with low carbon heating where closure is a risk, and expects a feasibility study for any low carbon bid. A heat decarbonisation plan provides much of that evidence.
Condition Improvement Fund bidsAir source heat pumps for schools
Air source heat pumps are a common route off gas for school buildings, because they sit on a roof or in a yard and connect to existing pipework. Whether the existing radiators and pipework can run at lower temperatures is something the plan checks room by room.
Air source heat pumpsGround source heat pumps for schools
Ground source heat pumps use pipework in boreholes or buried loops, so they depend on available land and ground conditions, and they cost more to install. School playing fields can offer the space. A plan compares ground source with air source on cost, disruption and running cost, so the decision rests on your site.
Net zero schools
If your trust or local authority has a net zero target, replacing gas heating is a major step towards it. The plan breaks that into phases you can afford, ordered by plant condition so replacements happen when boilers reach the end of life and not before.
Decarbonisation and retrofitChichester College: heat pumps installed on a live estate
Chichester College Group is the estate we have maintained for over 20 years, across 11 campuses under one PPM contract. Toshiba USX Edge heat pumps are installed at Chichester College, and a 140kW heat pump was installed from stock in 48 hours. The 2025 HVR Award for Innovative Project came out of that relationship. We also supported Chichester College’s CIF bid and delivered the funded works. It is the proof that a plan on paper can become a working heat pump on a school site.
What goes into a heat decarbonisation plan
- Plant surveyAge, condition and remaining life of boilers, pumps, controls and emitters, so replacement follows need.
- Electrical loadExisting supply and spare capacity checked against the load that heat pumps add.
- Options appraisalAir source, ground source, hybrid and retain-gas options costed on the same basis.
- RoadmapPhased works ordered by plant condition and programmed around term dates and holidays.
- REFCOM F-GasF-Gas registered engineers for heat pumps and other refrigerant-based plant.
- CDM 2015Construction (Design and Management) Regulations: duties on delivery and the health and safety file at handover.
More for school and college estates
Questions about heat decarbonisation plans and PSDS
What is a heat decarbonisation plan?
Is the Public Sector Decarbonisation Scheme still open?
What was PSDS Phase 4?
Is the Low Carbon Skills Fund still available?
How can a school fund a heat pump now?
Can a school use ground source heat pumps?
Do heat decarbonisation plans help with net zero targets?